SAFETY RESOURCES

Submit
Your
Safety Alert

You may submit your own Safety Alerts by filling out the Safety Alert Template and mailing it to safety@enform.ca. It will undergo our SA QA process and be posted for public consumption.

IRP Volume #3 - in situ Heavy Oil Operations

The purpose of this IRP Volume 3 - Heavy Oil and Oil Sands Operations, is to provide guidance in the development and production of Heavy Oil and Oil Sands reserves within Canada. This is accomplished by outlining current practices and setting minimum standards that encourage operating in a safe and environmentally sound manner. The focus is on practices, equipment, and procedures that are unique to Heavy Oil and Oil Sands operations. Although they are not a primary focus, the issues of hydrocarbon conservation, equity, and environment are mentioned in the Measurement Section IRPs as they provide necessary understanding of measurement needs.

Developer: DACC
Sponsor Organization: ERCB
Development Stage: Plublic Review
Current Status: Under Review February 2008
Other Information:

All feedback received in the summer of 2011 has been reviewed and incorporated into a second set of drafts posted below for a second review. This Public Review period will run through Wednesday, June 6, 2012.

May 2012 drafts:

3.1 Integrated Planning

This is the first draft of this chapter and its first industry review. This is the only scheduled posting for feedback. All content and IRP statements are new. We request a thorough review and comment on all content within this chapter.

3.2.1 Well Design

3.2.2 Well Control

3.2.3 Drilling Operations

3.3. Completions & Well Servicing

3.4 Facilities and Equipment

3.5 Production Operations

3.6 Production Measurement

In addition to the above IRP chapters, the IRP03 committee is accepting feedback on the document below:

Foam Cleanout

All files above can be accessed by clicking each hyperlink. Alternatively all files can be downloaded as an Adobe Portfolio. Click here to download IRP03 May2012 review drafts

 

Other Reference Links:

Primary and Remedial Cementing Guidelines:

click here to access Primary and Remedial Cementing Guidelines

Log on to Enform Connect to order Primary and Remedial Cementing Guidelines

Available Formats:



click here to access IRP03 - Heavy Oil and Oil Sands Operations (2002)

Log on to Enform Connect to order IRP03 - Heavy Oil and Oil Sands Operations (2002)

IRP03 - In Situ Heavy Oil Operation

IRP03 drafts POSTED. Your opportunity to have a say at this best practices documents ends June 6 ‘12
Learn More ...

Controlling Chemical Hazards - Tool

Enform has developed an interactive web-based tool for the upstream oil and gas industry
Learn More ...

Worker Struck By Falling Equipment

Two pipe tubs had been spun out from the edge of the lease with a pole truck ...
Learn More ...
  • CAGC
  • CAODC
  • CAPP
  • CEPA
  • PSAC
  • SEPAC